Value Engineering in Temporary Work

We had designed the temporary sheet pile wall up to 5m deep excavation of sewage treatment plant for our project in Cambodia. It was the alternative design to the Contractor’s temporary work proposal.

Our temporary work design had saved the Client approximate USD$100,000 or 45% of the original cost based on Contractor’s proposal. This made possible because our experience in similar type of works and detailed understandings of the subsoil profiles, soil parameters, water level and adjacent structure loadings.

The excavation and structural works completed in March 2021 and installation of system is on-going.